Lachis Season Planner v27beta for PCM 2012 (September, 8)
|
Jfox |
Posted on 28-07-2012 13:04
|
Amateur
Posts: 2
Joined: 26-07-2012
PCM$: 200.00
|
I just got the planner for the first time. seems really good although once ive made all my changes and exported to .cdb file, PCM wont recognize it when i try to load the save game. im a new player using steam with the latest patch and Real name DB installed. is there anything i can do to try and fix this? |
|
|
|
Lachi |
Posted on 28-07-2012 13:37
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
What do you mean with "pcm wont recognize it"
You are supposed to edit your save which is here: my document\pmc12\users\your name\database\solo\name of db\
If you save the cdb file in the same folder, then you should be able to load it in the game.
Where exactly did you struggle? Is there an error message? |
|
|
|
Jfox |
Posted on 28-07-2012 13:47
|
Amateur
Posts: 2
Joined: 26-07-2012
PCM$: 200.00
|
yes sorry i was loading the information from the wrong place (weekly saves folder). Thanks for your reply, everything is fine now. thank you for your work on this planner. very useful. |
|
|
|
Ad Bot |
Posted on 21-11-2024 20:17
|
Bot Agent
Posts: Countless
Joined: 23.11.09
|
|
IP: None |
|
|
guglu |
Posted on 05-08-2012 02:25
|
Amateur
Posts: 11
Joined: 05-08-2008
PCM$: 200.00
|
Hello
I planned my season with this program but don´t let me play the national championships, are simulated alone.
There any way to play them?
Thanks |
|
|
|
Lachi |
Posted on 05-08-2012 20:43
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
Sorry, I have no clue what you are talking about. My planner is just a tool, it does not let you play ANY race.
Consider asking such questions in the appropriate forum or thread.
Just take into consideration, then not all national championships are playable. Check the features of the DB you are playing. |
|
|
|
slbmangas |
Posted on 06-08-2012 00:08
|
Neo-Pro
Posts: 271
Joined: 25-04-2010
PCM$: 200.00
|
guglu wrote:
Hello
I planned my season with this program but don´t let me play the national championships, are simulated alone.
There any way to play them?
Thanks
It happened with me too, but only in 2016, in the other years the lachis season planner worked well |
|
|
|
Lachi |
Posted on 06-08-2012 21:19
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
What are you both talking about?
My planner has nothing to do with national championships. |
|
|
|
Btt69 |
Posted on 25-08-2012 15:14
|
Amateur
Posts: 2
Joined: 29-06-2009
PCM$: 200.00
|
Lachi thank you for this wonderful planner, i'm using it since 2010 but now with this new version it comes one small thing that I would like you to fix it. When we are plannig the season, in the bottom, the races doesn't show the type of stages (if it is hill, mountain, flat, cobble) like in the previous versions. Can you fix it? It helps a lot. |
|
|
|
Lachi |
Posted on 25-08-2012 16:08
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
This information is not available in the database of PCM2012.
I didn't want to release a planner for PCM12 because of this but people asked a lot, so I released it anyway. |
|
|
|
Avin Wargunnson |
Posted on 27-08-2012 08:19
|
World Champion
Posts: 14236
Joined: 20-06-2011
PCM$: 300.00
|
May i ask Lachi if you plan to add the feature you mentioned, some sort of auto creating the fitness plan according to the races to which the riders are signed. If i got it right when you mentioned you think about it...thanks.
|
|
|
|
Lachi |
Posted on 27-08-2012 08:56
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
Lachi wrote:
Rather would I implement an automatism to build schedules based on the race calendar. If you mean this, then I did not said that I am thinking about it. I just pointed out that I don't plan to implement predefined schedules. |
|
|
|
Avin Wargunnson |
Posted on 27-08-2012 09:54
|
World Champion
Posts: 14236
Joined: 20-06-2011
PCM$: 300.00
|
Lachi wrote:
Lachi wrote:
Rather would I implement an automatism to build schedules based on the race calendar. If you mean this, then I did not said that I am thinking about it. I just pointed out that I don't plan to implement predefined schedules.
Sorry to bother you...
|
|
|
|
Blueprint |
Posted on 27-08-2012 11:18
|
Domestique
Posts: 437
Joined: 29-03-2007
PCM$: 200.00
|
Lachi wrote:
What are you both talking about?
My planner has nothing to do with national championships.
Actually, it does. I don't know why or how, but after changing a .cdb with your season planner, the team is unsubscribed from all national championships. Quite a handy feature, because you can then ask 'wildcards' for those national championships that you want to ride (which will always be granted and you can proceed normally) and ignore those that you don't want to ride.
I've also noticed that the Tour of Beijing is not listed in the planner (using PCM'Actu DB, don't know if there's some data wrong there or a little bug in your planner). |
|
|
|
Lachi |
Posted on 27-08-2012 11:40
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
I never heard about this so I think both is related to the DB and not a problem/fault of my planner. |
|
|
|
MartijnVDD |
Posted on 27-08-2012 12:19
|
Breakaway Specialist
Posts: 801
Joined: 26-06-2012
PCM$: 200.00
|
Blueprint wrote:
I've also noticed that the Tour of Beijing is not listed in the planner (using PCM'Actu DB, don't know if there's some data wrong there or a little bug in your planner).
If you've got the same problem as me, it is listed, but it's not visible because it doesn't fit into the screen. You can see it by showing the complete programme including races you don't ride. |
|
|
|
Marcellus51 |
Posted on 27-08-2012 13:56
|
Under 23
Posts: 68
Joined: 11-08-2012
PCM$: 200.00
|
Blueprint wrote:
Actually, it does. I don't know why or how, but after changing a .cdb with your season planner, the team is unsubscribed from all national championships. Quite a handy feature, because you can then ask 'wildcards' for those national championships that you want to ride (which will always be granted and you can proceed normally) and ignore those that you don't want to ride.
I've also noticed that the Tour of Beijing is not listed in the planner (using PCM'Actu DB, don't know if there's some data wrong there or a little bug in your planner).
With pcmdaily database, i got Tour of Beijing in Lachi planner.
National championships are unsubscribed. |
|
|
|
Lachi |
Posted on 27-08-2012 15:17
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
Marcellus51 wrote:
National championships are unsubscribed.
So basically my planner does not work correctly but nobody cares about telling me? But then it is only fair that I don't care about fixing it... |
|
|
|
godio |
Posted on 29-08-2012 10:16
|
Amateur
Posts: 7
Joined: 29-10-2009
PCM$: 200.00
|
keep getting this message when i try to start a new plan.
----An error occured----
Year, Month, and Day parameters describe an un-representable DateTime.
----Stacktrace----
at System.DateTime.DateToTicks(Int32 year, Int32 month, Int32 day)
at PCM_SeasonPlaner.DBLoader.<FillHelpColumns>b__4(DataRow s)
at System.Linq.Enumerable.WhereSelectEnumerableIterator`2.MoveNext()
at System.Linq.Enumerable.Min[TSource](IEnumerable`1 source)
at System.Linq.Enumerable.Min[TSource,TResult](IEnumerable`1 source, Func`2 selector)
at PCM_SeasonPlaner.DBLoader.<FillHelpColumns>b__3(IGrouping`2 g)
at System.Linq.Enumerable.WhereSelectEnumerableIterator`2.MoveNext()
at PCM_SeasonPlaner.DBLoader.FillHelpColumns()
at PCM_SeasonPlaner.DBLoader.ImportDatabase(Object sender, DoWorkEventArgs e)
at System.ComponentModel.BackgroundWorker.OnDoWork(DoWorkEventArgs e)
at System.ComponentModel.BackgroundWorker.WorkerThreadStart(Object argument)
help please
thanks |
|
|
|
Lachi |
Posted on 29-08-2012 10:41
|
Grand Tour Champion
Posts: 8516
Joined: 29-06-2007
PCM$: 200.00
|
I cannot help you there. It is an error in your save and most probably also in the DB you are using. Open your save with an editor and check the columns gene_i_month and gene_i_day in the table STA_stage. You have to make sure that there are no wrong dates like 30th of February and that these columns are not empty. |
|
|
|
godio |
Posted on 30-08-2012 04:27
|
Amateur
Posts: 7
Joined: 29-10-2009
PCM$: 200.00
|
Lachi wrote:
I cannot help you there. It is an error in your save and most probably also in the DB you are using. Open your save with an editor and check the columns gene_i_month and gene_i_day in the table STA_stage. You have to make sure that there are no wrong dates like 30th of February and that these columns are not empty.
Is there any where else where there would be dates? i checked the stages table, there were a few races that the date was blank, fixed them but still get the same error.
thank you |
|
|